
8
Reassemble the parts in the reverse order of removing procedures.
Details for Removing Band
1
2
3
4
5
6
7
8
1
2
3
4
5
6
A
3
7
8
1
6
2
1
1. Band (RAS-8HRNME Only)
2. Removing brazing part (Outdoor heat
exchange).
3. Reversing Valve.
4. Removing Brazing part (Gas stop
valve).
5. Removing Brazing part (Compressor
suction pipe).
6. Removing Brazing part (Compressor
discharge pipe).
7. Valve stay.
8. Screw.
1. Screw.
2. P.
3. Silicon Plate.
4. Electrical box.
5. Reversing Valve.
6. Band.
7. Pipe.
8. F-Tape.
1. Cover by wet cloth.
2. Reversing valve.
¿
Removing Electronic expansion Valve and Solenoid Valve
1
Remove the service cover and rear cover following the
Removing service cover
, see on page 414
and the
Removing
the bottom service cover and rear cover
, see on page 415
.
2
Collect the refrigerant from the check joint following the
Removing the compressor
, see on page 419
.
3
Remove the coil following the
Removing reversing valve coil
, see on page 423
.
4
Remove the brazing as show in the figure below.
•
Electronic Expansion Valve (MV1): 2 brazing parts.
•
Solenoid Valve (SVA): 2 brazing parts.
•
Perform the brazing to remove and reassemble the electronic expansion valve by cooling with wet cloth.
•
Protect the connecting wires and pipe insulation from brazing flame.
5
Reassemble the parts in the reserve order of removing procedures.
1
2
1
2
1
2
1. Solenoid Valve.
2. Expansion Valve.
1. Expansion valve (MV1)
2. Removing brazing part
1. Solenoid valve (SVA)
2. Removing brazing part
10 Servicing
426
SMGB0060 rev. 1- 12/2010
Summary of Contents for RAS-10HRNM
Page 2: ......
Page 4: ...Index ii SMGB0060 rev 1 12 2010 ...
Page 56: ...2 Unit Installation 48 SMGB0060 rev 1 12 2010 ...
Page 117: ...RAS 4 6 HVRNM1E 4 Electrical Wiring 109 SMGB0060 rev 1 12 2010 4 ...
Page 118: ...RAS 4 6 HRNM1E 4 Electrical Wiring 110 SMGB0060 rev 1 12 2010 ...
Page 121: ...RAS 3HVRNS 4 Electrical Wiring 113 SMGB0060 rev 1 12 2010 4 ...
Page 122: ...RAS 4 6 HVRNS1E 4 Electrical Wiring 114 SMGB0060 rev 1 12 2010 ...
Page 123: ...RAS 8 10 HRNSE 4 Electrical Wiring 115 SMGB0060 rev 1 12 2010 4 ...
Page 124: ...4 Electrical Wiring 116 SMGB0060 rev 1 12 2010 ...
Page 145: ...Dry operation Continues in the next page 5 Control System 137 SMGB0060 rev 1 12 2010 5 ...
Page 147: ...Heating operation Continues in the next page 5 Control System 139 SMGB0060 rev 1 12 2010 5 ...
Page 148: ...5 Control System 140 SMGB0060 rev 1 12 2010 ...
Page 153: ...Activation for protection device control 5 Control System 145 SMGB0060 rev 1 12 2010 5 ...
Page 162: ...Activation for protection device control 5 Control System 154 SMGB0060 rev 1 12 2010 ...
Page 166: ...Preheating control of compressor 5 Control System 158 SMGB0060 rev 1 12 2010 ...
Page 168: ...5 Control System 160 SMGB0060 rev 1 12 2010 ...
Page 180: ...6 Optional functions 172 SMGB0060 rev 1 12 2010 ...
Page 224: ...8 Troubleshooting 216 SMGB0060 rev 1 12 2010 ...
Page 263: ...RAS 4 6 HVRNS1E 8 Troubleshooting 255 SMGB0060 rev 1 12 2010 8 ...
Page 264: ...RAS 8 10 HRNSE 8 Troubleshooting 256 SMGB0060 rev 1 12 2010 ...
Page 269: ...RAS 8 10 HRNSE 8 Troubleshooting 261 SMGB0060 rev 1 12 2010 8 ...
Page 337: ...RAS 4 6 HVRNM1E Cycle and structural parts 9 Spare Parts 329 SMGB0060 rev 1 12 2010 9 ...
Page 340: ...RAS 4 6 HRNM1E Cycle and structural parts 9 Spare Parts 332 SMGB0060 rev 1 12 2010 ...
Page 342: ... Electrical parts 9 Spare Parts 334 SMGB0060 rev 1 12 2010 ...
Page 354: ... Electrical parts 9 Spare Parts 346 SMGB0060 rev 1 12 2010 ...
Page 356: ...RAS 8 10 HRNSE Cycle and structural 9 Spare Parts 348 SMGB0060 rev 1 12 2010 ...
Page 359: ... Electrical parts 9 Spare Parts 351 SMGB0060 rev 1 12 2010 9 ...
Page 440: ...10 Servicing 432 SMGB0060 rev 1 12 2010 ...
Page 464: ...11 Electrical checks of main parts 456 SMGB0060 rev 1 12 2010 ...
Page 481: ......