4.5 Connecting to the Lines to be Measured (Preparing for Current Measurement)
64
Applying current sensors to lines to be measured
OK
Example: CT7136
Source side
Line
Load side
Current flow
direction arrow
Always clamp the instrument around only one conductor. Clamping the instrument around
two or more of conductors in a bundle prevents the instrument from measuring any current
regardless of whether the measurement target is a single-phase or three-phase circuit.
Make certain that the current flow direction
arrow points toward the load.
HIOKI PQ3198A961-03
Summary of Contents for PQ3198
Page 2: ...HIOKI PQ3198A961 03...
Page 6: ...Contents iv HIOKI PQ3198A961 03...
Page 20: ...Usage Notes 14 HIOKI PQ3198A961 03...
Page 44: ...2 3 Display Items and Screen Types 38 HIOKI PQ3198A961 03...
Page 58: ...3 8 Turning the Power On and Off Setting the Default Language 52 HIOKI PQ3198A961 03...
Page 102: ...5 8 Factory Settings 96 HIOKI PQ3198A961 03...
Page 198: ...12 4 Downloading Recorded Data to Computer 192 HIOKI PQ3198A961 03...
Page 264: ...14 4 Disposing of the Instrument 258 HIOKI PQ3198A961 03...
Page 296: ...A32 HIOKI PQ3198A961 03...
Page 299: ...Index Index 3 Index Wiring 73 Z Zero adjustment 53 Zero phase A28 HIOKI PQ3198A961 03...
Page 300: ...Index Index 4 HIOKI PQ3198A961 03...
Page 301: ...HIOKI PQ3198A961 03...
Page 302: ...HIOKI PQ3198A961 03...
Page 303: ...HIOKI PQ3198A961 03...
Page 304: ...www hioki com HIOKI PQ3198A961 03...