3. Prepare the drive.
4. Install the drive.
5. Determine the status of the drive from the drive LED definitions.
6. Close the front bezel.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the
Installing an NVMe SSD
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
IMPORTANT: During high performance workloads, NVMe SSDs can cause the fans to operate at high speeds to
maintain optimum system cooling. This high-speed fan operation leads to a sound pressure level of between 50
dB(A) to 55 dB(A). Hewlett Packard Enterprise recommends taking this possible acoustic condition into
consideration when selecting a site for a server that has NVMe SSDs installed.
Prerequisites
Before you perform this procedure:
72
Hardware options installation
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...