15. Make sure that the board is firmly seated in the slot.
16. Observe the guidelines for managing cables.
17. Connect all necessary internal cabling to the expansion board.
For more information on these cabling requirements, see the documentation that ships with the option.
18. Install the PCI blank retainer.
19. If the fan cage was removed, do the following:
a. Make sure that all the system cables that are routed through the front cable channel are properly secured in the
metal cable tabs. This is done to prevent system damage due to cables being inadvertently caught under the fan
cage.
22. Do one of the following:
Position the tower server for operation.
• Server in rack mode:
Slide the server into the rack.
23. Connect all necessary external cabling to the expansion board.
For more information on these cabling requirements, see the documentation that ships with the option.
24. Connect all peripheral cables to the server.
25. Connect each power cord to the server.
26. Connect each power cord to the power source.
140
Hardware options installation
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...