8.
While carefully holding the snap-in latch in the open position, slide the energy pack holder up to disengage it from
the chassis.
9.
Install the energy pack into the holder:
a. Route the energy pack cable through the holder cutout marked with a down arrow.
b. Install the energy pack in the holder.
10. Secure the energy pack cable through the holder cable clips.
Hardware options installation
135
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...