c. Repeat steps a–b on the other rail assembly.
2. Install the sliding rails on the server tray:
a. Align the notches on the rail with the pins on the side.
b. Slide the rail towards the rear of the tray to lock it into place.
c. Repeat steps a–b on the other inner rail.
3. Locate the orientation markers on the mounting rails:
• The front end of the rails is marked
FRONT.
• The rear end of the rails is marked with
L for left and R for right.
Hardware options installation
85
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...