a. Fasten the inner retention connector to left sliding rail hook.
b. Fasten the outer retention connector to left mounting rail hook.
c. Fasten the hinged connector to right mounting rail hook.
3.
Open the cable clamps.
4.
Route the rear panel cables and power cords though the CMA, and then close the cable clamps.
Employ industry best practices in routing and managing these rear panel cables and power cords.
90
Hardware options installation
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...