Section 5
Installation
Unpacking
On receipt of equipment on site, check all items are complete and undamaged. If for any
reason transit damage has occurred, ensure the extent of any damage is recorded and if considered
necessary report the incident to Gunnebo Entrance Control.
Retain all major component packaging for re-use in the event that items may need to be
returned for servicing during their life.
Tools required
•
Lifting equipment
•
Set of screwdrivers for slot-head screws
•
Set of screwdrivers for PHILLIPS screws
•
Reversible ratchet
•
Set of hexagonal sockets (metric)
•
Set of socket bits for Allen screws (metric)
•
Set of open ended spanners (metric)
•
Torque wrench
•
Diagonal cutting pliers
•
Rubber mallet
•
Automatic wire stripper
•
Crimping pliers for pre-insulated terminals
•
Insulated cable terminals
•
Hammer drill, vidiam bits D=10mm for expansion fastenings EAM10, or D=20mm for
expansion fastenings M10
•
EAM10 expansion fastening Fischer
•
M10 expansion fastening Fischer
•
Chalk Line Reel
•
Tape measure
•
Spirit level
n
ote
-t
he
lIftIng
equIpment
Should
Be
approprIate
for
the
weIght
of
the
BarrIer
,
and
characterIStIcS
of
the
aSSemBly
SIte
. t
he
weIght
of
S
peed
S
tIle
Bp dS
varIeS
from
250
kg
for
the
S
hort
n
arrow
left
(
or
rIght
)
caBInet
to
450
kg
for
the
l
ong
w
Ide
centre
caBInet
.
p
leaSe
read
all
SectIonS
carefully
Before
commencIng
the
InStallatIon
Site Preparation
Before assembly the following aspects should be taken into consideration:
Environmental conditions.
Power supply characteristics.
Physical space.
Cable layout.