96
In
tr
oduc
tion
Pr
oduc
t Description
Instruc
tions f
or use
Technica
l Inf
ormation
Insta
llation
Main
tenance
Spar
e P
ar
ts
Appendix
Con
ten
ts
Declar
ation
Oper
ation & Main
tenance Manual SpeedStile B
P DS
Commissioning
Power on the unit switching on the main circuit breaker and exit from the aisle.
1.
The doors start the closing movement and go in closed position. After a couple of
seconds the unit goes in running mode or signals a fault condition if a problem is
en-countered in the start-up phase. In that case check the error message on the
GC01 display.
2.
Check the photocell alignment by means of the sensor test utility (Main menu /
Diagnostic / View aisle).
3.
Operate the open and close test to verify that the leaves move without touching
the cabinet casing (Main menu / Diagnostic / Open-Close test).
4.
If the unit is equipped of the batteries option, check their charge status by means
of the battery test utility (Main menu / Diagnostic / Battery test). If the test
succeeds, test the door opening at the power failure event, switching off the main
circuit breaker.
5.
Launch the learning procedure on each MB01 motor board (see the section
“Launching the Learning Procedure”).
6.
Exit from maintenance menu and configure, if necessary, the desired parameters
setting. Then put the unit in running mode.
7.
Check the operating of the other connected equipment to the unit, as optional
remote control, card readers and other remote connections.
At the end of these operations, the system is fully operative.