11
Appendix
Declar
ation
Spar
e P
ar
ts
Main
tenance
Insta
llation
Technica
l Inf
ormation
Instruc
tions f
or use
pr
oduc
t Description
In
tr
oduc
tion
Con
ten
ts
Oper
ation & Main
tenance Manual SpeedStile B
P DS
When working on the equipment, remove any personal jewellery that may be conductive, or
clothing that may become entangled with mechanical parts.
Equipment Safety Systems
Safety systems and controls, such as interlocks, covers and guards, must not be overridden or
bypassed by personnel other than authorised staff who are qualified to carry out prescribed actions
within specified Warnings.
CE - Marking
The SpeedStile BP DS is CE marked, developed and manufactured according to the EU’s
Machinery, Low-Voltage and EMC-Directives.
Risk Assessment
Risk assessment is graded into categories of safety, rated 1 to 8 (where 8 is the highest risk
level). The following activities are covered.
Rating Activity
1
Cleaning
2
General Installation
3
Servicing
4
Servicing
General Maintenance
Using Chemical Fixers
5
Commissioning
8
Floor Drilling
Glass Panel Installation
Rating 1:
Cleaning.
Who is at Risk
Engineers or Site Personnel
Hazard
Miss-use of Cleaning Fluids
Current Controls
Compliance with COSHH regulations
Rating 2:
General Installation
Who is at Risk
Site Personnel
Hazard
Objects/Tools in Installation area
Current Controls
Trained Installation Engineers
Rating 4:
General Maintenance
Who is at Risk
Site Personnel
Hazard
Electric Shock
Current Controls
Isolation of Power/Trained Service Personnel
Using Chemical Fixer
Who is at Risk
Site Personnel within Vicinity of the Work Area