GSI Group - Laser Division
JK300HP/JK300P/JK125P
Pre-installation and User Manual
Issue 2.0
Page 112 of 172
Part No: 1EA300E01
9.4.3 Filling Procedure
The Coolant level should be between the minimum line and the maximum line indicated on
the reservoir. If it is close to the minimum line, Coolant should be added.
Figure 14 – Coolant Filling
Petitioners Canadian Solar Inc. and Canadian Solar (USA) Inc.
Ex. 1025, p. 112