GSI Group - Laser Division
JK300HP/JK300P/JK125P
Pre-installation and User Manual
Issue 2.0
Page 108 of 172
Part No: 1EA300E01
9.2 User Maintenance Tasks
Task Periodicity
Reference
Maint.
Level
General Inspection
Weekly
Section 9.3
1
Coolant replenishment
Section 9.4
1
Coolant Filter Replacement
12 months or 2000 hours*
Section 9.5
1
De-ioniser cartridge replacement
12 months or 2000 hours*
Section 9.6
1
Pump replacement
Section 9.7
1
Arc-lamp Replacement
As necessary or when
elapsed hours of Lamp
reaches the configured limit
Section 9.8
1
Fibre optic cable replacement and
alignment
Section
9.9
1
Coverslide cleaning and replacement As necessary
Section 9.10
1
Focus lens cell replacement.
Section 9.11
1
Surge Suppressor Replacement
On failure
Section 9.12
1
Bulb replacement
On failure
Section 9.14
1
Bendlock assembly
Section 9.15
1
Pointing diode replacement and
alignment
Section
9.16
1
* Whichever is sooner.
Petitioners Canadian Solar Inc. and Canadian Solar (USA) Inc.
Ex. 1025, p. 108