68 / 116
00CNO0192-E (U0627512)
CONDENSINOX -
Installation, Use and Maintenance
D. SPECIFIC START-UP PROCEDURE
"
Fit and connect the accessories.
"
Start up the boiler alone.
"
Make the following adjustments.
On boiler no. 1: master
Line No. Value
• Menu
Time and date
Set the time
Hour / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
• Menu
Configuration
Start heating circuit 1
Heating circuit 1 (5710)
On
Start heating circuit 2
Heating circuit 1 (5715)
On
Start heating circuit 3
Heating circuit 1 (5721)
On
Configure the DHW pump
Relay QX2 output (5891)
DHW pump/valve Q3
Configure the isolation valve Q1.1
Relay QX3 output (5892)
Boiler pump Q1
Configure the cascade flow sensor B10:
Sensor input BX2 (5931)
Common flow
sensor B10
Configure the extension modules
Extension module 1 function (6020)
Heating circuit 1
Extension module 2 function (6021)
Heating circuit 2
Extension module 3 function (6022)
Heating circuit 3
Configure the direct circuit
Relay QX23 output, module 1 (6032)
Pump HC1 Q2
•
Configure as master of the cascade: Menu
LPB network
Device number
Appliance address (6600)
1
Segment number
Segment address (6601)
0
Configure the bus supply
Bus supply function (6604)
Automatic
Set the clock program
Clock operation (6640)
Master
• Menu
Heating circuit 1
Adjust the comfort setpoint
Comfort temperature setpoint (710) - - -
Set the curve slope
Heating curve slope (720) - - -
ATTENTION:
Configure the switches correctly for the AVS75 extension modules.
Diagram: CX11
page 5 / 10