BetaCell 241 Maintenance Procedure
Description Procedure
Time
1. Access Machine Control screen via Main Menu on PV
2. Touch Auto Startup
3. Access Status screen via Main Menu on PV
4. System is ready when correct ratio is displayed, temperatures
have reached process temperatures and a green GO is at the
bottom of screen
5. Access Operator screen via Main Menu on PV
6. Select correct Sequence and touch Reset
Auto Startup from
Sleep Mode
7. Trigger
Gun
10 min
8. Access Machine Control screen via Main Menu on PV
9. Verify switches on front panel are in run position
10. Touch Auto Startup
11. Access Status screen via Main Menu on PV
12. System is ready when correct ratio is displayed, temperatures
have reached process temperatures and a green GO is at the
bottom of screen
13. Access Operator screen via Main Menu on PV
14. Select correct Sequence and touch Reset
Auto Startup from
Complete Shut Down
(Buffer tank temp. >
100ºF)
15. Trigger Gun
15-20
min
16. Access Tank Control Screen
17. Turn on Curative and Pre poly Agitators
Auto Startup from
Complete Shut Down
(Buffer tank temp. <
90ºF)
18. Turn on Tank heaters. Allow material temperature to increase
above 90ºF.
2 hours
Summary of Contents for BetaCell 241D
Page 6: ...6...
Page 8: ...Specifications System Dimensions 54 108 98 3 16...
Page 11: ...11 DESCRIPTION OF CONTROLS 1...
Page 15: ...15 Help Screen A Help Screen is available for each of the Menu Screens...
Page 24: ...24 Maintenance Menu Press to access the Maintenance screen Password Required...
Page 30: ...30 AutoStart Set Up Screen This screen is for qualified technicians only...
Page 31: ...31 Sleep Mode Set Up Screen This screen is for qualified technicians only...
Page 37: ...37 DESCRIPTION OF MAJOR COMPONENTS 2...
Page 38: ...38 System Schematic...
Page 44: ...44 Buffer tank 2 1 6 7 5 8 9 4 3...
Page 45: ...45 13 10 12 Fumes piped away by others in accordance with plant specifications 11...
Page 55: ...55 AutoFill Valve Maintenance There is no normal operating maintenance Position Indicator...
Page 65: ...65 Hydraulic Power Pack Schematic...
Page 78: ...78 DAILY PROCEDURES 4...
Page 80: ...80 FAULT MANAGEMENT 5...
Page 88: ...88 MAINTENANCE 6...