
- Remove the three guide pins and the mobile half
pulley.
Removing the driven half-pulley bearing
- Remove the roller bearing with the special ex-
tractor inserted from the bottom of the fixed half-
pulley.
CAUTION
POSITION THE HOLDING EDGE OF THE EXTRACTION PLI-
ERS BETWEEN THE END OF THE BEARING AND THE
BUILT IN SEALING RING.
Specific tooling
001467Y029
Bell for bearings, O.D. 38 mm
- Remove the ball bearing retention snap ring.
- Expel the ball bearing from the side of the clutch
housing by means of the special tool.
N.B.
PROPERLY SUPPORT THE HALF-PULLEY SO AS NOT TO
DEFORM THE SLIDING SURFACE OF THE DRIVING BELT
Specific tooling
020376Y
Adaptor handle
020363Y
20 mm guide
Inspecting the driven fixed half-pulley
- Check that there are no signs of wear on the work
surface of the belt. If there are, replace the half-
pulley..
- Make sure the bearings do not show signs of un-
usual wear.
- Measure the external diameter of the pulley bush-
ing.
Characteristic
Runner RST 50 SP
Engine
ENG - 71
Summary of Contents for Runner RST 50 SP
Page 1: ...SERVICE STATION MANUAL 639189 Runner RST 50 SP ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 17: ...INDEX OF TOPICS TOOLING TOOL ...
Page 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 37: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 43: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 60: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 66: ...INDEX OF TOPICS ENGINE ENG ...
Page 98: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 109: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 117: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 123: ...Runner RST 50 SP Cooling system COOL SYS 123 ...
Page 124: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 136: ...Chassis Runner RST 50 SP CHAS 136 ...
Page 137: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 141: ...INDEX OF TOPICS TIME TIME ...