CHAPTER 6: ACTUAL VALUES
469 MOTOR MANAGEMENT RELAY – INSTRUCTION MANUAL
6–23
When the relay set for the “Wye” VT connection type, voltages are measured at terminals
G2 (V
A
), H1 (V
B
), and H2 (V
C
) with respect to G1 (V
COM
). Refer to the figure below for details.
The phase-to-phase voltages are calculated using the following relationships:
Vab =
×
VA
Vbc =
×
VB
Vca =
×
VC
FIGURE 6–8: Wye VT Connection
The quantities displayed by the relay and the EnerVista 469 Setup software are
straightforward and follow the phasor diagram shown below. Note that all the angles
shown are negative or lagging angles.
FIGURE 6–9: Typical Phasor Diagram for Wye Connection
Using the same example as for the open delta connection, except for the
VT CONNECTION
TYPE
setting to “Wye”, the following quantities are displayed by the relay and EnerVista 469
Setup software:
In the
A2 METERING DATA
VOLTAGE METERING
menu:
VAB
: “4025 Volts”
VBC
: “4025 Volts”
VCA
: “4025 Volts”
AVERAGE LINE VOLTAGE
: “4025 Volts”
VAN
: “2323 Volts”
3
3
3
806562A1.CDR
806557A1.CDR
Phase
R
otat
i
on
System Voltages:
Van
;
Vab
Vbn
;
Vbc
Vcn
;
Vca
Vbn
Vcn
Vab
Vbc
Vca
V
C
(
H2 –
G
1
)
VB (
H1 –
G
1
)
V
A
(G
2 –
G
1
)
Measured Voltages
Calculated Voltages
Displayed Voltages:
Van
=
V
A
Vbn
=
VB
Vcn
=
V
C
Vab
= A
s
C
a
l
cu
l
ated
Vbc
= A
s
C
a
l
cu
l
ated
Vca
= A
s
C
a
l
cu
l
ated
Van
V
A
3
Vab
×
=
VB
3
Vbc
×
=
V
C
3
Vca
×
=
Summary of Contents for Masoneilan 469 Series
Page 4: ......
Page 92: ...3 28 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 3 INSTALLATION ...
Page 256: ...5 112 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 5 SETTINGS ...
Page 298: ...6 42 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 6 ACTUAL VALUES ...
Page 321: ...CHAPTER 8 APPENDIX 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL 8 9 808712A1 CDR ...
Page 330: ...8 18 469 MOTOR MANAGEMENT RELAY INSTRUCTION MANUAL CHAPTER 8 APPENDIX ...