3-2
F35 MULTIPLE FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
PANEL CUTOUTS
CHAPTER 3: INSTALLATION
3
The Instruction Manual outlines how to install, configure, and use the unit. The Communications Guide is for advanced use
with communication protocols. The warranty is included at the end of this instruction manual and on the GE Grid Solutions
website.
3.2 Panel cutouts
This section does not apply to the HardFiber Brick; see its instruction manual.
Install the relay in an indoor environment within the environmental specifications. The relay complies with Pollution
Category II, which means installation in an office, laboratory, or testing environment.
3.2.1 Horizontal units
The F35 is available as a 19-inch rack horizontal mount unit with a removable front panel. The front panel can be specified
as either standard or enhanced at the time of ordering. The enhanced front panel contains additional user-programmable
pushbuttons and LED indicators.
The modular design allows the relay to be upgraded and repaired by qualified service personnel. The front panel is hinged
to allow access to the removable modules, and is itself removable to allow mounting on doors with limited rear depth.
The case dimensions are shown in the following figure, along with panel cutout details for panel mounting. When planning
the location of your panel cutout, ensure that provision is made for the front panel to swing open without interference to or
from adjacent equipment.
The relay must be mounted such that the front panel sits semi-flush with the panel or switchgear door, allowing the
operator access to the keypad and the RS232 communications port. The relay is secured to the panel with the use of four
screws supplied with the relay.
The front panel can be switched in the EnerVista software between enhanced and standard panels under
Maintenance > Change Front Panel
.