63
K415 Issue No. 1
1
Bleed hose assembly
2
Priming pump
3
Screw-press
4
UUT/system under test
5
UUT bleed valve
6
Isolation valve
O -
Open
C
-
Closed
Figure A2 - Priming/Test Set-up
Bleeding the System (Figure A2)
Before any measurements can be made, the hydraulic system needs to be primed and
bled free of air. During the following operations, prepare for fluid spillage and provide a
suitable receptacle for collecting the spillage.
1.
Prepare for use as detailed on page 62.
2.
Fill a suitable container with clean hydraulic fluid and place the bleed hose assembly
(1) connected to the priming port into the fluid.
3.
Open the UUT bleed valve (5) and, if possible, fit a hose to the bleed point and locate
the hose end in a container of the same hydraulic fluid.
4.
Use the priming pump (2), to pump hydraulic fluid into the instrument and the
connected system. Monitor the hydraulic fluid level, ensuring that the bleed hose
assembly (1) stays below the fluid level and is not allowed to suck in air. Top-up
hydraulic fluid level as necessary.
1
4
2
3
Hydraulic Calibrator Versions Operation
Summary of Contents for Druck DPI 610
Page 1: ...Druck DPI 610 615 Portable Pressure Calibrator Series User manual K415 GE Sensing ...
Page 2: ......
Page 10: ...K415 Issue No 1 viii ...
Page 69: ...59 K415 Issue No 1 Hydraulic Calibrator Versions ...
Page 70: ...K415 Issue No 1 60 This page intentionally left blank ...
Page 76: ...K415 Issue No 1 66 This page intentionally left blank ...
Page 77: ...67 K415 Issue No 1 Low Pressure Calibrator Versions ...
Page 78: ...K415 Issue No 1 68 This page intentionally left blank ...
Page 87: ...77 K415 Issue No 1 Appendix 1 DATA LOG FILE EXAMPLE ...
Page 88: ...K415 Issue No 1 78 This page intentionally blank ...