PanaFlow™ LC User’s Manual
3
Chapter 2. Installation
Chapter 2. Installation
2.1 Installation Guidelines
This section provides general information with respect to the mechanical and electrical installation, and
should be thoroughly reviewed before the system is installed. To ensure safe and reliable operation of the
PanaFlow™ LC, the system must be installed in accordance with the established guidelines. Those
guidelines, explained in detail in this chapter, include the following topics:
•
Unpacking the PanaFlow LC System
•
Site Considerations
•
Making Electrical Connections
WARNING!
The PanaFlow™ LC flow meter can measure the flow rate of many fluids, some
potentially hazardous. The importance of proper safety practices cannot be overemphasized.
WARNING!
Be sure to follow all applicable local safety codes and regulations for installing
electrical equipment and working with hazardous fluids or flow conditions. Consult company
safety personnel or local safety authorities to verify the safety of any procedure or practice.
Attention European Customers!
To meet CE Mark requirements, all cables must be installed as
.
Summary of Contents for Baker Hughes PanaFlow LC XMT1000
Page 1: ...Flow 910 327 Rev A Sep 2019 bhge com PanaFlow LC User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 10: ...Contents viii PanaFlow LC User s Manual ...
Page 14: ...Preface xii PanaFlow LC User s Manual no content intended for this page ...
Page 142: ...Appendix E CE Mark Compliance 128 PanaFlow LC User s Manual no content intended for this page ...
Page 182: ...Warranty 168 PanaFlow LC User s Manual no content intended for this page ...
Page 189: ......