PanaFlow™ LC User’s Manual
13
Chapter 2. Installation
6.
From the other mark on the top of the pipe, measure around the pipe in the opposite direction a
distance equal to 1/4 of the pipe circumference, or the same distance used in Step 5. Use the center
punch to make a mark at this point.
Figure 13: SCF Odd Number of Traverse Installation, Step 6
7.
Center one of the blocks over one of the center punch marks on the side of the pipe. Align the block so
that the pressure bolt is directly over the punch mark. Secure the block by wrapping the two steel
straps around both the block and the pipe and tightening the straps.
Figure 14: SCF Odd Number of Traverse Installation, Step 7
8.
Repeat Step 7 to install the other block on the pipe.
IMPORTANT:
Make sure both straps are perpendicular to the bottom of the block. If the straps are slanted, the
slack will cause the block to move. Also, the transducer spacing dimension may change after the
transducers are mounted.
Summary of Contents for Baker Hughes PanaFlow LC XMT1000
Page 1: ...Flow 910 327 Rev A Sep 2019 bhge com PanaFlow LC User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 10: ...Contents viii PanaFlow LC User s Manual ...
Page 14: ...Preface xii PanaFlow LC User s Manual no content intended for this page ...
Page 142: ...Appendix E CE Mark Compliance 128 PanaFlow LC User s Manual no content intended for this page ...
Page 182: ...Warranty 168 PanaFlow LC User s Manual no content intended for this page ...
Page 189: ......