Appendix B. Using the Clamping Fixtures
108
PanaFlow™ LC User’s Manual
Figure 97: GCF Even Traverse Installation, Step 3
4.
Using a level and center punch, make two marks on the line drawn in step 3. These marks must be
separated by the transducer spacing distance S, as calculated by the flowmeter.
Figure 98: GCF Even Traverse Installation, Step 4
5.
From each of the marks on the top of the pipe, measure around the pipe in the same direction a
distance equal to 1/4 the pipe circumference. Use the center punch to make a mark at each location.
Figure 99: GCF Even Traverse Installation, Step 5
6.
Center one of the blocks over one of the center punch marks on the side of the pipe. Align the block so
that the pressure bolt is directly over the punch mark. Secure the block by wrapping the two steel
straps around both the block and the pipe and tightening the straps.
IMPORTANT:
Make sure both straps are perpendicular to the bottom of the block. If the straps are slanted, the
slack will cause the block to move. Also, the transducer spacing dimension may change after the
transducers are mounted.
Summary of Contents for Baker Hughes PanaFlow LC XMT1000
Page 1: ...Flow 910 327 Rev A Sep 2019 bhge com PanaFlow LC User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 10: ...Contents viii PanaFlow LC User s Manual ...
Page 14: ...Preface xii PanaFlow LC User s Manual no content intended for this page ...
Page 142: ...Appendix E CE Mark Compliance 128 PanaFlow LC User s Manual no content intended for this page ...
Page 182: ...Warranty 168 PanaFlow LC User s Manual no content intended for this page ...
Page 189: ......