![GE AKTAprocess Operating Instructions Manual Download Page 104](http://html.mh-extra.com/html/ge/aktaprocess/aktaprocess_operating-instructions-manual_128019104.webp)
Connect a packed column with
bypass lines/valves
Follow the instruction below to connect a pre-packed column with bypass lines/valves
to ÄKTAprocess.
Action
Step
Connect tubing between the column bottom and the system valve marked
COLUMN BOTTOM.
1
Connect tubing between the column top and the system valve marked
COLUMN TOP.
2
Set the system column valves to the UpFlow position.
3
Using the pump, fill the system with an appropriate liquid for column instal-
lation.
4
When the system, including the tubing connected to the column, is filled
with liquid, stop the pump.
5
Use the manual valves on the column to change from bypass to in-line.
6
Final considerations
Once the column is connected, the following should be taken into consideration.
•
Make sure to activate the system alarm(s) again after the filling sequence.
•
When the pump is started, the system must be in Column UpFlow position.
104
ÄKTAprocess Operating Instructions 29-0252-49 AA
4 Installation
4.4 ÄKTAprocess Setup
4.4.6 Connect a column
Summary of Contents for AKTAprocess
Page 1: ...GE Healthcare Life Sciences ÄKTAprocess Operating Instructions Original instructions ...
Page 2: ......
Page 179: ......