—
30
—
Operating Procedures / Photos
Disassemble Motor and Evaporator
Use screwdriver to screw off the two screws
beside the isolation plate and then screw off
the eight screws to remove the motor.
Use screwdriver to screw off the two screws of
the connection board of evaporator. Screw off
the two screws at the tube-exit plate.
Use screwdriver to screw off the screw at the
support of evaporator, disassemble the
support of evaporator, and then manually pull
the evaporator assy to remove it. (refer to
Figure 8-11)
Disassemble Air Outlet Rear Side
Plate Sub-assy
First remove the velvet sheet and the left and
right side plate cushions at the air outlet; then
use screwdriver to screw off the screw shown
in the figure. (refer to Figure 8-14 and 8-15)
Screw
Screw
Screw
Figure 8-11
Figure 8-12
Screw
Figure 8-13
Liquid Level Switch
Pump
Cable Bundle
Pump Drainage
Pipe
Screw
Figure 8-14
Figure 8-15
Summary of Contents for AIR C18
Page 2: ......
Page 3: ......
Page 5: ... 2 Model Remarks GE AIR C24 Communication Ceiling Mounted Unit 1PH 230V 50Hz R407C ...
Page 14: ... 11 Applicable to GE AIR C24 OUT Unit mm Over 600 Bolt Nut Wrench ...
Page 15: ... 12 Applicable to GE AIR C34 C41 OUT 378 Unit mm Over 600 Bolt Nut Wrench ...
Page 17: ... 14 Electrical Diagram GE AIR C18 GE AIR C24 6 ...