Post-Installation Configuration & Checkout
Apollo CNX80 Installation Manual
560-0982-00 Rev D
3-9
3.3 E
QUIPMENT
O
PERATIONAL
/F
UNCTIONAL
T
EST
Following equipment configuration, use the CNX80 Test Function (3.3.1.1) and Interface Monitor
Function (3.3.1.2) as necessary to verify that the interfaces are wired correctly. Once the wiring is verified,
perform the System Checkout (3.3.2).
3.3.1 CNX80
C
HECKOUT
U
TILITIES
3.3.1.1 Test
Function
The Test function allows the checkout of the display, controls, and I/O of the CNX80. While in the Ground
Maintenance mode, press the
TEST
smart key to enter the Test menu, which is shown in the top part of
Figure 3-9. Additional items on the TEST menu (shown in the bottom part of Figure 3-9) are available by
pressing the
NEXT PAGE
line select key.
main page
second page
Figure 3-9 - TEST Main Pages
Summary of Contents for Apollo CNX80
Page 1: ...Apollo CNX80 Installation Manual September 2003 560 0982 00 Rev D...
Page 10: ...Table of Contents viii 560 0982 00 Rev D Apollo CNX80 Installation Manual NOTES...
Page 30: ...General Information 1 20 560 0982 00 Rev D Apollo CNX80 Installation Manual NOTES...
Page 114: ...Periodic Maintenance 6 2 560 0982 00 Rev D Apollo CNX80 Installation Manual NOTES...
Page 134: ...Appendix D Interconnect Diagrams D 2 560 0982 00 Rev D Apollo CNX80 Installation Manual NOTES...
Page 167: ......
Page 168: ......