Revision 4
17
12/15/2018
3.5 Unpacking
The ACCUCHROME Natural Gas Chromatograph is packed for shipment in a wooden crate.
To unpack the system:
a) Remove the lid by undoing the screws
.
b) Once the lid is off, remove the excess packing material and boxes from the shipping
crate.
c) Visually inspect the small packages to ensure that no major damage has occurred. If
damage has occurred, contact the shipping company and Galvanic Applied Sciences.
Place the small packages aside in a safe, secure storage area as they are not needed at
this stage of the system installation.
d) Inspect the internal equipment to ensure that no damage has occurred and that no
components have become loose during transport.
If any damage is visible contact Galvanic Applied Sciences Inc. immediately and do not
proceed with the system installation. Do not attempt to facilitate repairs yourself as this
will negate and/or invalidate any possible insurance claim or equipment warranty.
e) If no damage is apparent, the analyzer system is ready for transport to the installation
(sample point) site.
3.5 Installation Steps
The ACCUCHROME analyzer was tested and configured at the factory. The program
parameters are documented in the Configuration Report (enclosed with this manual).
To install the ACCUCHROME Natural Gas Chromatograph:
a) Firmly bolt the analyzer to the plant support structure. The structure should be able to
support the system.
The Class 1 Div 1 system has four (4) 3/4" diameter holes to accommodate the mounting
to the plant support structure. The plant support structure should be suitable for mounting
the analyzer frame.
The Class 1, Div 2 system has four (4) 3/4" diameter holes to accommodate the mounting
to the plant support structure. The plant support structure should be suitable for mounting
the analyzer frame.
Follow all plant/company safety procedures while installing the
ACCUCHROME.
b) Connect the source of carrier gas. The carrier gas should be supplied to the analyzer at
80 - 100 psig using ¼” stainless steel tubing. For uninterrupted carrier gas it is
recommended that a cross over manifold system be used.
Summary of Contents for AccuChrome MA2963
Page 21: ...Revision 4 8 12 15 2018 Figure 2 7 The Intrinsically Safe Barrier ...
Page 24: ...Revision 4 11 12 15 2018 Figure 2 10 4 Minute Analysis Flow Diagram ...
Page 58: ...Revision 4 45 12 15 2018 Figure 4 24 Chart Commands ...
Page 65: ...Revision 4 52 12 15 2018 A sample report is shown in Figure 4 32 Figure 4 32 Sample Report ...
Page 80: ...Revision 4 67 12 15 2018 Figure 5 10 Streams Setup ...
Page 104: ...Revision 4 91 12 15 2018 Figure 8 2 Enron Mode Short Integers ...
Page 140: ...Revision 4 127 12 15 2018 ...
Page 141: ...Revision 4 128 12 15 2018 15 2 Valve Maintenance Instructions ...
Page 142: ...Revision 4 129 12 15 2018 ...