
Turning ON the Power
First, turn ON the power switch of the main unit, Super Module, and Input Box. Then, turn ON the
power switch of the display unit. The screen will be displayed, and monitoring will start.
The power supply LED on the input box will light in green.
Display Unit
Main Unit
Super Module
Input Box
The power of the main unit, Super Module, and Input Box interlocks with the power switch (
)
operation (ON/OFF) on the display unit. During normal usage, the power switch (
) of the main
unit, Super Module, Input Box should be left ON.
C A U T I O N
If not using for a long period of time, turn OFF the power of the main unit,
Super Module, and Input Box.
As the Super Module and DSC-7300 communicates via Input Box, the
power of the Input Box must be always turned ON even if the module is
not inserted in the Input Box.
3
-
10
Summary of Contents for IB-7300
Page 15: ...Blank Page xii ...
Page 21: ...Blank Page xviii ...
Page 45: ...5 Fix in place with the four screws provided Screw M3x8 4 provided 3 6 ...
Page 71: ...Blank Page 4 22 ...
Page 73: ...Wiring Diagram 5 2 ...
Page 74: ...DC24V Cable 5 3 ...
Page 75: ...Fan Cable 5 4 ...
Page 76: ...AC PWR Cable 5 5 ...
Page 77: ...Ground Terminal Cable 5 6 ...
Page 78: ...Wiring Diagram in the Inlet Unit 5 7 ...
Page 79: ...BlankPage 5 8 ...
Page 85: ...Main Unit Assembly Drawing 410 2905 7 2 ...
Page 86: ...7 3 ...
Page 96: ...External Appearance 1 410 2906 7 13 ...
Page 97: ...External Appearance 2 410 2907 7 14 ...
Page 98: ...Packing Instruction 410 2908 7 15 ...
Page 99: ...Blank Page 7 16 ...
Page 119: ...Blank Page 9 12 ...