
Periodic Check Procedure (Parameter Modules)
The periodic check lists for parameter modules that can be used with the IB-7300 are shown on the
following pages.
Periodic checks should be performed referring to the periodic check procedures for the whole
biological information monitoring equipment.
・
P10-22 Periodic Check List (HR-500)
・
P10-23 Periodic Check List (HB-500)
・
P10-24 Periodic Check List (HC-500)
・
P10-25 Periodic Check List (HF-500)
・
P10-26 Periodic Check List (HC-530)
10
-
21
Summary of Contents for IB-7300
Page 15: ...Blank Page xii ...
Page 21: ...Blank Page xviii ...
Page 45: ...5 Fix in place with the four screws provided Screw M3x8 4 provided 3 6 ...
Page 71: ...Blank Page 4 22 ...
Page 73: ...Wiring Diagram 5 2 ...
Page 74: ...DC24V Cable 5 3 ...
Page 75: ...Fan Cable 5 4 ...
Page 76: ...AC PWR Cable 5 5 ...
Page 77: ...Ground Terminal Cable 5 6 ...
Page 78: ...Wiring Diagram in the Inlet Unit 5 7 ...
Page 79: ...BlankPage 5 8 ...
Page 85: ...Main Unit Assembly Drawing 410 2905 7 2 ...
Page 86: ...7 3 ...
Page 96: ...External Appearance 1 410 2906 7 13 ...
Page 97: ...External Appearance 2 410 2907 7 14 ...
Page 98: ...Packing Instruction 410 2908 7 15 ...
Page 99: ...Blank Page 7 16 ...
Page 119: ...Blank Page 9 12 ...