Split system (Single phase and 3-phase type)
104
Maintenance
Document
1544-1
INVERTER PCB removal
PFC PCB removal
FILTER PCB removal
Screws
Screw
Hook
Holder
IPM
Remove the connectors
and screws
For screws of IPM.
Note the tightening torque at the
installation.
Tightening torque is 1.2=-0.2N.M
Remove the INVERTER PCB.
Spread the heat dissipation
compound on the other side of IPM
when you exchange INVERTER PCB
by the repair.
Screw
Screws
Hook
Holder
IPM
Remove the connectors
and screws
For screws of IPM.
Note the tightening torque at the
installation.
Tightening torque is 1.2=-0.2N.M
Remove the PFC PCB.
Spread the heat dissipation compound
on the other side of IPM when you
exchange PFC PCB by the repair.
Locking
spacers
Spacers
Earth screw
Remove the connectors, locking spacers,
spacers, and earth screw.
3-Phase type
Summary of Contents for Waterstage WO G112LCT Series
Page 2: ......