
122
Upgrade and Maintenance Manual
TX300 S7 / RX350 S7
Basic hardware procedures
4.11
Mounting the server in the rack
4.11.1 Seating the server on the rack rails
V
CAUTION!
At least two people are needed to position the server on the rack rails.
(For the Japanese market, please refer to "
安全上のご注意
".)
For configurations below 32 kg:
At least two people are needed to lift the server
into the rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server
into the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server
into the rack cabinet.
Summary of Contents for PRIMERGY TX300 S7
Page 6: ...Upgrade and Maintenance Manual TX300 S7 RX350 S7 ...
Page 32: ...32 Upgrade and Maintenance Manual TX300 S7 RX350 S7 ...
Page 36: ...36 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Introduction ...
Page 162: ...162 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Basic software procedures ...
Page 188: ...188 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Power supply ...
Page 396: ...396 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Fans ...
Page 548: ...548 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Main memory ...
Page 752: ...752 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Front panel and external connectors ...
Page 822: ...822 Upgrade and Maintenance Manual TX300 S7 RX350 S7 System board and components ...
Page 876: ...876 Upgrade and Maintenance Manual TX300 S7 RX350 S7 Cabling ...