Air settings ...
←
←
←
←
ID fan MIN
35%
←
Lower control limit; check during initial setup
Start from 0% and test going up in steps of 5%. . Start
level setting through control parameter,
→
ID fan start
point
Fan MIN
16%
←
Adjustment to fan in use – do not change setting
Fan MAX
65%
←
Fan speed at maximum output
Factory settings: P2-10: 60%, P2-15: 65%, P2-20:
70%, P2-25: 75%
100% output from
Flue gas temp.
100°
←
←
←
←
If the flue gas temperature is above the specified
target value, fuel output should reach 100% (upper
point of the start ramp)
Output at flue gas temp.
of 20°
50%
←
←
←
←
Output limit (lower point of the start ramp)
Offset for ID fan
0%
←
←
←
←
The ID fan curve is increased by this value
New induced draft fan Y
←
←
←
←
ID fan with rubber buffer
→
Y
ID fan with spacers
→
N
Pellets feed
...
←
←
←
←
Feed MAX
70%
←
Slide-in at maximum output for systems without
lambda probes; systems with lambda probes are
controlled by the O2 regulator.
STBY. Wait 1
10m
←
1. Shutdown pause before the 1st safety slide-in
STBY. Wait 2
20m
←
2. Pause between 1st and 2nd safety slide-in
Shutdown slide-in
1s
←
Duration of safety slide-ins (for status: Shutdown slide-
in 1 and 2)
Ash screw Runtime:
5s
←
←
←
←
Runtime of the ash screw
Ash screw Cycle:
1200
←
←
←
←
Ash screw cycle; control of the ash screw depending on
the pellet slide-in.
EOS runtime
20s
←
←
←
←
Runtime of heat exchanger cleaning
Outfeed
...
←
←
←
←
1. Start time for
automatic filling
15:00
←
←
←
←
1. Start time for filling. This is only carried out if the fill
level in the container is under 85%.
Only with suction
discharge unit!
2. Start time for
automatic filling
15:00
←
←
←
←
2. Start time for filling. This is also only carried out if
the fill level in the container is under 85%.
Period of screw
cycle
30s
←
←
←
←
Discharge screw runtime, minus a pause of 10* sec.
(*Pause time = “Suction unit pre-activation time”)
Preliminary suction
10s
←
Time before the discharge screw starts
ID fan after shut down
15s
←
Time after discharge screw stops.
For sucking the hose clear.
Fill cyclone below:
35%
←
Minimum level of day store
suction cycle starts when
the level falls below this value.
Note: with underground tanks or bag silos the values
for pre-activation and post-shutdown times should be
set according to the manufacturer’s instructions.