![Froling P2-10 Operating Instructions Manual Download Page 17](http://html1.mh-extra.com/html/froling/p2-10/p2-10_operating-instructions-manual_2338701017.webp)
Operating the System
Initial startup
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestraße 12, A-4710 Grieskirchen, Austria
Page 17
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected] www.froeling.com
B0190806
3
3
Operating the System
3.1
Initial startup
Initial startup should be carried out with an authorised installer or with Fröling
customer services.
The individual steps of the initial setup procedure are explained in the
chapter on “Installers and service technicians”
Page 59, 7.4 Initial startup
If condensation escapes during the initial heatup phase, this does not
indicate a fault.
If this occurs, clean up using a cleaning rag.
3.2
Filling/ refilling the store with fuel
Damage and injuries can occur if the store is filled when the boiler is
on!
Turn off the boiler with the
key
Allow the boiler to cool down for at least half an hour.
When the boiler has cooled down:
Close all opening to the store to seal out dust
Fill the store with pellets
Only use permitted pellets
Page 9, 2.2.1 Permitted fuel