Service Manual MCC Cold US 20220700
Page 19
4.9 Connecting drain (Cold unit only)
During the installation process of the MCC Cold, a drain connection must be made.
Connect the drain of the unit, onto the main drain of the building using PVC piping
(not included).
If no drain connection can be made, an evaporation tray must be placed.
4.10 Installation of the evaporation tray
(including specification)
1.
Turn of unit, and pull power plug from wall outlet.
2.
Open back panel of unit ( refer 11.16)
3.
Extend drain of unit, using the delivered drain pipe.
Cut pipe on required length (depending on measurements of unit).
4.
Put angle piece on end of drain pipe, exactly above the evaporator tray.
5.
Place evaporation tray in position and mount this with two bolts and nuts
Evaporation tray must be placed with the serial number label faced to the back
of the unit. Label must remain visible (readable) (see drawing below)
6.
Connect power cord of evaporator tray to outlet on electrical box of MCC unit.
4.1 Connecting drain or evaporation tray
Summary of Contents for MCC 120
Page 4: ...Page 4 Service Manual MCC Cold US 20220700...
Page 20: ...Page 20 Service Manual MCC Cold US 20220700 4 1 Connecting drain or evaporation tray...
Page 21: ...Service Manual MCC Cold US 20220700 Page 21 4 1 Connecting drain or evaporation tray...
Page 30: ...Page 30 Service Manual MCC Cold US 20220700 5 1 MCC 90 Drop in Dimensions Self Serve...
Page 39: ...Service Manual MCC Cold US 20220700 Page 39 6 0 Installation Front door section first version...
Page 83: ...Service Manual MCC Cold US 20220700 Page 83...
Page 87: ...Service Manual MCC Cold US 20220700 Page 87...
Page 89: ...Service Manual MCC Cold US 20220700 Page 89 Page intentionally left blanc...
Page 102: ...Page 102 Service Manual MCC Cold US 20220700 13 0 Electrical schematics MCC Cold first version...
Page 104: ...Page 104 Service Manual MCC Cold US 20220700 13 2 Electrical wiring MCC Cold Self Serve N L...