va06.0_0060g_Eng.fm
103
Fiche
s d’in
te
rven
tion
Unscrew the 2 screws (marker 6) of the air detector board (marker 7).
6
6
7
Remove the board being careful not to pull out the flat cable.
Disconnect the flat cable connected to the board at J1.
J1
Re-assembling
Carry out the dismantling procedure in reverse order to re-assemble the unit.
Calibrate the air bubble detector.
Carry out the regular servicing tests (see Quality Control Certificate).
Summary of Contents for Volumat Agilia
Page 1: ...0 9 C E S Volumat Agilia Technical Manual ...
Page 6: ...66 TM_Volumat_Agilia_Eng_TDM fm ...
Page 8: ...8 va01_001e_Eng fm Introduction 1 2 Operation diagram ...
Page 12: ...12 va01_001e_Eng fm Introduction ...
Page 26: ...26 va02_001e_Eng fm Description and operation ...
Page 30: ...30 va03 1_001e_Eng fm Description of the menus ...
Page 62: ...62 va04 4_001e_Eng fm Preventive maintenance ...
Page 70: ...70 va05 1_001e_Eng fm Troubleshooting ...
Page 76: ...76 va06 0_001g_Eng fm Intervention procedures ...
Page 82: ...82 va06 0_0011g_Eng fm Intervention procedures ...
Page 86: ...86 va06 0_0021g_Eng fm Intervention procedures ...
Page 94: ...94 va06 0_0040g_Eng fm Fiches d intervention ...
Page 104: ...104 va06 0_0060g_Eng fm Fiches d intervention ...
Page 110: ...110 va06 0_0070g_Eng fm Fiches d intervention ...
Page 134: ...134 va07 1_001g_Eng fm Calibrations ...
Page 136: ...136 va08 0_001d_Eng fm Spare parts catalogue ...