Installation and commissioning
17
3
Installation and commissioning
This chapter describes how to set up and install the PostBase Vision franking system
in the following versions
– with hand feed tray (basic model)
– with the ‘Hand-feed Sealer’
– with the ‘PostBase Vision Feeder’.
Caution!
Follow the steps for setup and installation of the PostBase Vision
franking system in precisely the given order to ensure successful installation.
Step 1:
Unpacking and checking the contents of the package
• Unpack all the boxes.
Keep the packing. Use it again if you need to
transport the franking system or send it in to
the Customer Support.
• Check that the contents of the packages
are complete and free from any damage.
The scope of delivery is listed on the
following pages.
Warning!
Damage or the absence of parts
can lead to injuries and hazards due to
electrical voltage.
Do not start operating the PostBase Vision
franking system if parts are damaged or miss-
ing. Please contact FP Customer Support.