FCP-75 Manual —
P/N LS10147-003FK-E:A 3/17/2021
5
2.1: Federal Communications Commission (FCC).................................................................................................................................................12
2.2: Underwriters Laboratories (UL) ......................................................................................................................................................................13
2.2.2: Requirements for Central Station Fire Alarm Systems ........................................................................................................................13
2.2.3: Requirements for Local Protected Fire Alarm Systems .......................................................................................................................13
2.2.4: Requirements for Remote Station Protected Fire Alarm Systems........................................................................................................13
2.2.5: Requirements for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment, NFPA 720..................................13
2.2.6: NFPA Requirements .............................................................................................................................................................................14
3.1: Inventory..........................................................................................................................................................................................................15
3.2: Environmental Specifications ..........................................................................................................................................................................15
3.3: Software Downloads........................................................................................................................................................................................15
3.4: Electrical Specifications ..................................................................................................................................................................................15
3.5: Wiring Specifications.......................................................................................................................................................................................16
3.6: Board Assembly Diagram................................................................................................................................................................................17
3.7: Calculating Current Draw and Standby Battery ..............................................................................................................................................17
3.7.1: Current Draw Worksheet Requirements...............................................................................................................................................17
3.7.2: Current Draw Worksheet for Fike IDP SLC Devices ..........................................................................................................................18
4.2: AC Power Connection .....................................................................................................................................................................................21
4.3: Battery Power ..................................................................................................................................................................................................22
4.4.1: Calculating Wiring distance for SBUS modules ..................................................................................................................................24
4.4.2: Wiring Configurations ..........................................................................................................................................................................26
Flush Mounting.......................................................................................................................................................................................27
Surface Mounting ...................................................................................................................................................................................29
Flush Mounting.......................................................................................................................................................................................31
Surface Mounting ...................................................................................................................................................................................32
Flush Mounting.......................................................................................................................................................................................33
Surface Mounting ...................................................................................................................................................................................35
Summary of Contents for FCP-75
Page 144: ...Cut along dotted line ...
Page 145: ...FCP 75 Manual P N LS10147 003FK E A 3 17 2021 145 ...