Chapter 6 Fastening Operation
PAGE 6-74
D-No.546 Reverse Ramp Up Time
[msec]
Setting range: 100~5000, Default setting: 500
Sets the time constant for acceleration from zero speed to the maximum reverse rotation speed.
The reverse ramp up time is used in the following cases;
・
Manual reverse by turning on
(“OFF”
→
”ON”) the PLC I/O input signal “REVERSE.”
・
The reverse ramp up time used in D-
No. 002 [Fastening Option]: “Reverse before Fastening.”
・
The reverse ramp up time used in D-
No. 006 [Fastening Interrupt Operation]: “Reverse Between 1-2 Steps ON.”
・
The reverse ramp up time used in D-
No. 006 [Fastening Interrupt Operation]: “Reverse Between 2-3 Steps ON.”
D-No.547 CCW Wait Time Between Steps
[msec]
Setting range: 0~500, Default setting: 200
Sets the (stopped) waiting time when normal rotation changes to reverse rotation when fastening is
interrupted by a reverse rotation operation.
Note: 200ms is the minimum recommended wait time. Setting lower than this may affect tool life
due to sudden shock generated by high speed motor direction changes.
This is used in the following cases;
・
The reverse wait time used in D-
No. 002 [Fastening Option]: “Reverse before Fastening.”
・
The reverse wait time used in D-
No. 006 [Fastening Interrupt Operation]: “Reverse Between 1-2 Steps ON.”
・
The reverse wait time used in D-No. 006 [Fastening Interrupt
Operation]: “Reverse Between 2-3 Steps ON.”
D-No.548 Option
[deg]
Setting range: 1 ~ 72
*Not used
D-No.549 Option
[deg]
Setting range: 1 ~ 100
*Not used
Summary of Contents for Handheld Nutrunner HFC3000
Page 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Page 14: ...Notes ...
Page 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Page 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Page 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Page 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Page 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Page 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Page 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Page 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Page 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Page 230: ......
Page 231: ......