Chapter 4 Installation and Wiring
PAGE 4-12
BATCH OK RESET: BATCH COUNTER RESET SIGNAL
PIN No.: TB3-5
After performing fastening for the set number of times (when using the Batch count feature), the cycle
count value is cleared automatically at the start of the next fastening process. The count will also be
cleared with this signal.
If the WORK SELECT has been input to TB1 or changed on the front panel of the controller, the
current cycle count value is cleared by input of this reset signal.
BANK SELECT: OUTPUT SIGNAL BANK SELECT SIGNAL
PIN No.: TB1-12
The signal definition of the eight output signals are changed by switching ON/OFF the BANK SELECT
signal.
UNUSED
PIN No.: TB3-6,
This is not used.
WORK SELECT 0 ~ 4: Work Select Signals
PIN No.: TB1-7 ~ 11
WORK SELECT 5: Work Select Signals
PIN No.: TB3-9
A
parameter set can be selected ‘on the fly’ by using the Work SELECT inputs (Up to 64). They can be
selected by a combination of the WORK SELECT 0 ~ WORK SELECT 5 input signals (selection for up
to 64 parameters (Work Select bit 5) can only be used from a Fieldbus interface or from the front
display panel). (Work Select Bit 5 firmware ver. 1.310 or later)
WORK SELECT
5
PIN No.:TB3-9
WORK SELECT
4
PIN No.: TB1-11
WORK SELECT
3
PIN No.: TB1-10
WORK SELECT
2
PIN No.: TB1-9
WORK SELECT
1
PIN No.: TB1-8
WORK SELECT
0
PIN No.: TB1-7
WORK
No.
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
1
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
2
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
3
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
ON
4
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
5
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
ON
6
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
ON
OFF(OPEN)
7
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
ON
ON
8
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
9
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
ON
10
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
ON
OFF(OPEN)
11
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
ON
ON
12
OFF(OPEN)
OFF(OPEN)
ON
ON
OFF(OPEN)
OFF(OPEN)
13
OFF(OPEN)
OFF(OPEN)
ON
ON
OFF(OPEN)
ON
14
OFF(OPEN)
OFF(OPEN)
ON
ON
ON
OFF(OPEN)
15
OFF(OPEN)
OFF(OPEN)
ON
ON
ON
ON
16
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
17
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
ON
18
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
ON
OFF(OPEN)
19
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
ON
ON
20
OFF(OPEN)
ON
OFF(OPEN)
ON
OFF(OPEN)
OFF(OPEN)
21
OFF(OPEN)
ON
OFF(OPEN)
ON
OFF(OPEN)
ON
22
OFF(OPEN)
ON
OFF(OPEN)
ON
ON
OFF(OPEN)
23
OFF(OPEN)
ON
OFF(OPEN)
ON
ON
ON
24
OFF(OPEN)
ON
ON
OFF(OPEN)
OFF(OPEN)
OFF(OPEN)
25
OFF(OPEN)
ON
ON
OFF(OPEN)
OFF(OPEN)
ON
26
OFF(OPEN)
ON
ON
OFF(OPEN)
ON
OFF(OPEN)
27
OFF(OPEN)
ON
ON
OFF(OPEN)
ON
ON
28
OFF(OPEN)
ON
ON
ON
OFF(OPEN)
OFF(OPEN)
29
OFF(OPEN)
ON
ON
ON
OFF(OPEN)
ON
30
OFF(OPEN)
ON
ON
ON
ON
OFF(OPEN)
31
OFF(OPEN)
ON
ON
ON
ON
ON
32
Summary of Contents for Handheld Nutrunner HFC3000
Page 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Page 14: ...Notes ...
Page 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Page 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Page 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Page 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Page 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Page 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Page 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Page 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Page 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Page 230: ......
Page 231: ......