Chapter 6 Fastening Operation
PAGE 6-28
●
Angle Check [deg]
•Final Angle
The Angle high and low limit values from the point of Snug Torque to the end of fastening are set.
Fastening operation is ended if the angle high limit value is exceeded during the fastening operation.
●
Timeout Check [sec]
•1st Time
The 1
ST
Time high and low limit values from the start of fastening to 1st torque or the 1st angle are set.
•2nd Time
The 2
nd
Time high and low limit values from 1st torque or the 1st angle to the end of fastening are set.
In regards to the time low limit, if the fastening operation reaches its target in a time less than the time set in
the low limit, a low limit reject will occur. If the 1st and 2nd time high limit is exceeded during the fastening
operation, the operation is stopped and a High Limit reject will occur.
When 2 or 3 steps is selected as the number of fastening steps, the delay times between fastening steps
are not counted as part of 1st time and 2nd time. Additionally, the self-check function executed before the
start of fastening operation is not counted as any cycle time.
●
Rundown Revolutions Check [rev.]
•Rundown revolutions
The high and low limit values of the rundown revolutions from the fastening start point to the fastening end
point are set.
Summary of Contents for Handheld Nutrunner HFC3000
Page 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Page 14: ...Notes ...
Page 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Page 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Page 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Page 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Page 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Page 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Page 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Page 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Page 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Page 230: ......
Page 231: ......