Chapter 6 Fastening Operation
PAGE 6-32
●
Break away Torque Check
The Break away Torque value during reverse rotation is judged .
When D-No. 110 [Reverse Torque High Limit] is exceeded, the fastening operation is
ended and an abnormal is output. (A09-
08 “Reverse Torque Error”) The detection high
limit depends on the firmware version installed; (as shown in the table below)
Controller
Software
Version
Break away
Torque
Check
Reverse rotation operation
Fastening
Option:
“Reverse Before
Fastening”
Interrupt Operation
During Fastening:
“Reverse Between
1-2 Steps
” and
“Reverse Between
2-3 Steps
”
PLC I/O
input signal
“REVERSE”
Reversing
switch
operation
less than
V1.002
Disable (0)
Without limit
Enable (1)
D-No. 110 [Reverse Torque High Limit]
Without limit
V1.002
~
V1.204
Disable (0)
Without limit
D-No. 110
[Reverse Torque High Limit]
Enable (1)
D-No. 110 [Reverse Torque High Limit]
V1.205 or later
Disable (0)
1.3 times D-No.100 [Calibration torque]
D-No. 110
[Reverse Torque High Limit]
Enable (1)
D-No. 110 [Reverse Torque High Limit]
・
D-No. 110 [Reverse Torque High Limit] The default setting is 5Nm. In reverse operation, the
tool will automatically stop at the [Reverse Torque High Limit] for operator safety. (This limit
can be changed by the user)
Torque
Angle
D-No.110 [Reverse Torque High Limit]
or
1.3 times of D-No.100 [Calibration torque]
A.09-08
is generated
Reverse stop
Summary of Contents for Handheld Nutrunner HFC3000
Page 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Page 14: ...Notes ...
Page 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Page 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Page 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Page 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Page 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Page 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Page 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Page 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Page 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Page 230: ......
Page 231: ......