Operation/Adjustment
Never operate the equipment with wet hands.
Failure to observe this instruction may cause electric shock.
Use the equipment under the following conditions.
◆
Ambient temperature: 0°C~+45°C (Avoid freezing)
◆
Ambient humidity: 90% RH or lower (Avoid moisture)
◆
Atmosphere: Indoors (Avoid direct sunlight)
No corrosive gases or flammable gases
No oil mist, dust, water, salt, iron powder
◆
Avoid direct vibration or shocks.
Failure to meet these conditions may cause earth leakage and malfunction.
Confirm and adjust all parameters before operation in order to prevent unexpected movement
of the equipment.
Failure to observe this instruction may cause an injury, malfunction, or fault.
Never conduct extreme adjustments or setting change that may cause instability of operation.
Failure to observe this instruction may cause an injury, malfunction, or fault.
Do not turn ON and OFF the equipment repeatedly. Failure to observe this instruction may
cause a malfunction.
Do not use the equipment at a torque higher than the maximum torque.
Failure to observe this instruction may shorten equipment life or cause breakage due to high
temperature caused by overload.
In case any abnormality occurs, remove the cause and ensure safety before resetting and
restarting the equipment.
Failure to observe this instruction may cause injury.
It is occurred reaction in sudden rise torque in the following cases.
Please attach the reaction jig.
Retightening bolt(nut) which already tighten.
Loosing bolt(nut) which already tighten.
Caution
Safety Precautions
Summary of Contents for Handheld Nutrunner HFC3000
Page 2: ...www fec usa com Copyright 2017 FEC AUTOMATION SYSTEMS All Rights Reserved ...
Page 14: ...Notes ...
Page 15: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Page 21: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Page 28: ...Chapter 2 Specifications PAGE 2 8 Blank Page ...
Page 29: ...Chapter 3 Sysytem Description PAGE 3 1 Chapter 3 System Description 3 ...
Page 36: ...Chapter 3 System Description PAGE 3 8 Memo ...
Page 37: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation Wiring 4 ...
Page 67: ...Chapter 5 Power Up and Operational Tests PAGE 5 1 Chapter 5 Power Up and Operational Tests 5 ...
Page 71: ...Chapter 6 Fastening Operation PAGE 6 1 Chapter 6 Fastening Operation 6 ...
Page 151: ...Chapter 7 Troubleshooting PAGE 7 1 Chapter 7 Troubleshooting 7 ...
Page 169: ...Chapter 8 Options PAGE 8 1 Chapter 8 Options 8 ...
Page 181: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 1 Chapter 9 Fieldbus I O Interfaces 9 ...
Page 229: ...Chapter 9 Fieldbus I O Interfaces PAGE 9 49 Blank Page ...
Page 230: ......
Page 231: ......