Hardware configuration.
CNC 8070
7.
CENTRAL U
N
IT
FOR C
ABI
NET (Q7-A
PLATFORM).
Conn
ecti
ons.
·168·
(R
EF
: 1911)
Mapping the bus resources.
The mapping consists of allocating among the available resources in the bus and the PLC
resources (inputs, outputs or registers). The digital inputs and outputs are mapped to
resources of the same type in the PLC. Analog inputs and outputs are mapped to PLC
registers.
Fagor has the "Fagor EtherCAT Mapper" program to carry out the mapping. From the ENI
file generated by the EtherCAT configurator, this program makes a mapping proposal. The
user can accept this proposal or perform the necessary modifications, all in a way that helps
ensure there are no duplicated resources. Once the mapping is completed, this software
creates a file with the description of the routing. This file must be copied to the folder
../Mtb/Data of the CNC with the name "resourceRouterConf.xml".
Summary of Contents for CNC 8070
Page 1: ...Ref 1911 8070 CNC Hardware configuration...
Page 8: ...BLANK PAGE 8...
Page 14: ...BLANK PAGE 14...
Page 18: ...BLANK PAGE 18...
Page 22: ...BLANK PAGE 22...
Page 24: ...BLANK PAGE 24...
Page 26: ...BLANK PAGE 26...
Page 28: ...Hardware configuration CNC 8070 1 PREVIOUS INFORMATION 28 REF 1911...
Page 94: ...Hardware configuration CNC 8070 6 CENTRAL UNIT MONITOR Q7 A PLATFORM 94 REF 1911 C70 15AT...
Page 273: ...Hardware configuration CNC 8070 273 User notes REF 1911...
Page 274: ...Hardware configuration CNC 8070 274 User notes REF 1911...
Page 275: ...Hardware configuration CNC 8070 275 User notes REF 1911...