S
UMMIT
S
WITCH
I
NSTALLATION
AND
U
SER
G
UIDE
1-13
S
UMMIT
R
EAR
V
IEW
S
UMMIT
R
EAR
V
IEW
Figure 1-8
shows the rear view for the Summit1 and the Summit2.
Figure 1-8: Summit rear view
P
OWER
S
OCKET
The Summit automatically adjusts to the supply voltage. The power supply operates
down to 90 V. The fuse is suitable for both 110 V AC and 220-240 V AC operation.
S
ERIAL
N
UMBER
You may need this serial number for fault-reporting purposes.
C
ONSOLE
P
ORT
Use the console port (9-pin, ÒDÓ type connector) for connecting a terminal and carrying
out local out-of-band management.
R
EDUNDANT
P
OWER
S
UPPLY
P
ORT
The redundant power supply (RPS) port is used to connect to a Summit RPS. The
Summit RPS provides a redundant power source to the Summit. If the primary power
source for the Switch fails, the Summit RPS takes over, ensuring uninterrupted network
operation.
In addition, when connected to a Summit RPS, the Summit Switch can provide status
on power and fan operation of the RPS through SNMP and the command-line interface.
The Summit RPS can simultaneously provide power for up to two Summit Switches.
130001-00 Rev.03
C
MADE IN USA
U
L
U
L
!
SERIAL NUMBER
MAC ADDRESS
PART NUMBER
MODEL/NUMBER
Console port
RPS port
Power socket and fuse
SUMMIT.BK Page 13 Thursday, September 25, 1997 12:33 PM