10
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
Contents
Replacing MSMs
260
Chapter 16
BlackDiamond 6800 Series I/O Modules
Configuring I/O Modules
263
10GX
3
Module
264
G8Ti Module
266
G8Xi Module
267
G12SXi Module
269
G16X
3
Module
270
G24T
3
Module
273
F48Ti Module
275
F96Ti Module
276
F32Fi Module
279
P3cSi, P3cMi, P12cSi, and P12cMi Modules
280
ARM
284
MPLS Module
287
A3cSi and A3cMi Modules
290
I/O Module LEDs
293
Installing I/O Modules
294
Verifying the I/O Module Installation
295
Displaying Slot Status Information
296
Replacing I/O Modules
296
Installing XENPAK Modules
297
Chapter 17
Replacing the BlackDiamond 6800 Series Switch Fan Tray
Removing a BlackDiamond 6800 Series Fan Tray
299
Installing a BlackDiamond 6800 Series Fan Tray
301
Part 6
Switch Operation
Chapter 18
Initial Switch and Management Access
Connecting Equipment to the Console Port
305
Logging In for the First Time
306
Part 7
Appendixes
Appendix A
Safety Information
Important Safety Information
309
Power
309
Summary of Contents for e" series
Page 18: ...18 Extreme Networks Consolidated e and i Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated e and i Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......