228
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
BlackDiamond 6800 Series Switch Overview
To increase switch reliability, you can install additional power supplies as needed. If you have three or
more power supplies installed in a BlackDiamond 6816 switch or two or more power supplies installed
in a BlackDiamond 6808 or BlackDiamond 6804 switch, you can remove one of the power supplies
without turning off power to the chassis.
Table 45 lists the minimum number of power supplies required to power a BlackDiamond 6800 series
chassis.
NOTE
If you install four power supplies in a BlackDiamond 6816 chassis, the power supplies will deliver full
redundancy.
The BlackDiamond 6800 series switch generates SNMP traps for the following events:
•
AC power source fails
•
Power supply fails
•
Power supply is removed
For more information about planning your site and power requirements, see “Meeting Power
Requirements” in Chapter 2. For more information about the specifications of the BlackDiamond 6800
series switch power supplies, see Table 84 on page 334.
220 VAC Power Supplies
If you install a 220 VAC power supply in the BlackDiamond 6800 series chassis, 220 volts of power is
required for full operation. If 110VAC power is supplied, some BlackDiamond I/O modules might not
power up.
The MSM performs power calculations and powers up the maximum number of I/O modules from left
(slot 1) to right (slot 8) in the BlackDiamond 6808, or top (slot 1) to bottom (slot 4 in the BlackDiamond
6804 and slot 16 in the BlackDiamond 6816). A module is skipped if that module is not within the
power budget. Using 110 VAC, only eight modules in the BlackDiamond 6816, four modules in the
BlackDiamond 6808, and two modules in the BlackDiamond 6804 are powered on.
The BlackDiamond switch does not support installing a combination of the old 220 VAC PSUs (part
number 50012) with the new iPower 220 VAC PSUs (part number 50021) in the same chassis.
The 220 VAC power supply ships with one L6-20P (locking) power cable.
220 VAC power supplies slide in from the front of the chassis, as illustrated in Figure 128.
Table 45:
PSUs required to power up the chassis
Switch Model
Number of PSUs
Installed
BlackDiamond 6816
2
BlackDiamond 6808
1
BlackDiamond 6804
1
Summary of Contents for e" series
Page 18: ...18 Extreme Networks Consolidated e and i Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated e and i Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......