72
Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
Summit Switch Models
Console Port
Use the console port (9-pin, “D” type connector) for connecting a terminal and carrying out local
management.
Port Connections
The Summit 300-48 switch uses a combination of 10BASE-T/100BASE-TX ports using RJ-45 connectors
and small form factor pluggable (SFP) Gigabit interface connectors (GBICs), also known as mini-GBICs.
Power Supply Status LEDs
LED
Color
Indicates
OUT
Solid Green
The output voltages are enabled and within specification.
Off
There is a fault on at least one output voltage or voltages are out
of specification.
TEMP
Solid Amber
The fan failed or there is an over temperature condition.
Off
The fan is operating normally and operating temperature is within
limit.
IN
Solid Green
The input voltage is within specification and the input section is
working.
Off
The input voltage is out of range or there is a fault in the input
section.
10/100 Mbps Port Status LEDs
Color
Indicates
Green, solid
Link is present and port is enabled; non-powered device.
Green, fast blinking
Port is enabled; link is up, device non-powered and activity on the
port.
Amber, solid
Link is present and port is enabled; device powered.
Amber, slow blinking
Link is down or port is disabled; device powered.
Amber, fast blinking
Port is enabled; link is up, device powered and activity on the
port.
Alternating amber/green
There is a power fault.
Off
The link is down or the port is disabled; non-powered device.
10/100/1000 Mbps Port Status LEDs
Color
Indicates
Green solid
Link is present; port is enabled; full-duplex operation.
Green blinking
Link is present; there is activity.
Amber blinking
Reserved.
Off
Link is not present or the port is disabled.
Fiber Port Status LEDs
Color
Indicates
Solid Green
Link is present; port is enabled; full-duplex operation.
Blinking Green
Link is present; there is activity.
Off
Link is not present; port is disabled; mini-GBIC is not installed.
Table 13:
Summit 300-48 switch LED activity (Continued)
Summary of Contents for e" series
Page 18: ...18 Extreme Networks Consolidated e and i Series Hardware Installation Guide Preface...
Page 19: ...Part 1 Common Features...
Page 20: ......
Page 25: ...Part 2 Site Planning...
Page 26: ......
Page 56: ...56 Extreme Networks Consolidated e and i Series Hardware Installation Guide Site Preparation...
Page 57: ...Part 3 Summit Switch...
Page 58: ......
Page 137: ...Part 4 Alpine Switch...
Page 138: ......
Page 213: ...Part 5 BlackDiamond Switch...
Page 214: ......
Page 303: ...Part 6 Switch Operation...
Page 304: ......
Page 307: ...Part 7 Appendixes...
Page 308: ......