Run and Verify Hoist Electrics and Data
Verify Hoist Is Not On Overtravel Limit
Verify Hoist Motor Orientation
Terminate Lift Lines to the Drum
Step 1: Verify the Drum is At Top Dead Center
Step 2: Thread Lift Lines Through SafeStop and Drum
Step 3: Attach Stop Sleeves to Lift Lines
Step 4: Finalize Lift Line Termination
Finalize Hoist and Cable Management Installation
Attach the Platter to the Hoist
Attach Cable Assembly to Platter
Ensure SafeStop Devices are Open
Level the Hoist and Test Movement
Adjust SafeStop Device Position for Fleet Angle
Configure and Test Hoist Operation
ii
Prodigy FlyPipe Installation Guide