13
Prodigy FlyPipe Installation Guide
For helix cable management, you can
use the four cable clips included in the
helix cable management box to run
power and data across the drum
section of the hoist. To attach the
clips, join the two sides around the
pipe extrusion and secure with the M6
screw provided. Run cable ties through
the slots in the clips to secure your
power and data cables to the length of
the hoist between the helix platter and
motor box.
Emergency Stop Termination
nine-pin
connector
for hoist
control
To run the hoist and set your commissioning travel
limits, you need a completed Emergency Stop (E-
stop) circuit. This circuit is typically completed when
the control system is installed and energized. If a
control system is not installed or operational, insert
the nine-pin E-stop Termination Bypass Plug (ETC
part # 8050B7002) into the nine-pin connector on
the top of the motor box. This completes the circuit
and allows you to temporarily operate the hoist from
the local controls.
CAUTION:
Do not insert the E-stop Termination Bypass Plug into a Power
and Control Distribution (PCD) box. Doing so could short out the control
wiring.
CAUTION:
Do not leave the hoist unattended when the E-stop Termination
Bypass Plug is in place. If you need to leave the hoist for any period of time,
remove the plug from the hoist.