Run and Verify Hoist Electrics and Data
12
Chapter 4
Run and Verify Hoist Electrics and Data
After the initial cable management installation, you have access to your hoist electric and data
cables. It is important to run them to the appropriate connectors on the hoist and verify that the
hoist is running properly before you terminate the lift lines to the drum.
Run Power and Data
Connector receptacles on motor box
Power
Data
The hoist ships with a power cable and a data cable.
The power cable has a Twist-Lock receptacle
connector on one end, which you should connect at
the motor box on the hoist. The other end has a
Twist-Lock plug connector, which connects to the
FlyPipe Power and Control Distribution (PCD) box.
The data cable has round nine-pin connectors
attached to each end, one of which you should
connect to a receptacle on the hoist motor box. The
other end connects to the FlyPipe PCD box.
Note:
Each time you power the hoist on, a 10 second delay will occur before
movement can begin. During this time, the Power status LED will blink.
For additional information, refer to the
Prodigy and FlyPipe PCD Electronics Installation Guide
.