Setup & Operation 3. Environment and Installation
N6 Rev.2
31
3.2 Unpacking, Transportation, and Relocation
Using a cart or similar equipment, transport the Manipulator in the same conditions as it
was delivered. Observe the following when unpacking the Manipulator.
The installation shall be made by qualified installation personnel and should conform to all
national and local codes
.
WARNING
■ Only authorized personnel should perform sling work and operate a crane or a
forklift. When these operations are performed by unauthorized personnel, it is
extremely hazardous and may result in serious bodily injury and/or severe
equipment damage to the robot system.
■ Stabilize the Manipulator with your hands when hoisting it. Unstable hoisting is
extremely hazardous and may result in serious bodily injury and/or severe
equipment damage to the robot system as the fall of the Manipulator.
CAUTION
■ When removing the anchor bolts, support the Manipulator to prevent falling.
Removing the anchor bolts without supporting the Manipulator may get hands,
fingers, or feet caught as the Manipulator may fall.
The base and the Arm #1 are fixed by the fixing
jig for transportation.
Make sure to remove the fixing jig before the
robot operates.
Fixing jig for transportation
■ To carry the Manipulator, be sure to have at least 2 people to hold the bottom of
the base or the Arm by hand. When holding the base installation face by hand,
be careful not to cause your hands and fingers caught.
N6-A1000**
Weight: 69 kg: 152 lb
N6-A850**R
Weight: 64 kg: 141 lb
■ Avoid excessive vibration or shock during Manipulator transporting. Excessive
vibration or shock may cause equipment damage to and/or malfunction of the
Manipulator.
Summary of Contents for N6 Series
Page 1: ...Rev 2 EM187R3735F 6 Axis Robots N6 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual N6 series Rev 2 ...
Page 8: ...vi N6 Rev 2 ...
Page 14: ......
Page 27: ...Setup Operation 1 Safety N6 Rev 2 15 N6 A850 R C A D F G F E H G F B G F G F F F N6 A850 BR F ...
Page 34: ...Setup Operation 2 Specifications 22 N6 Rev 2 N6 A850 BR Cable direction Upward ...
Page 52: ...Setup Operation 3 Environment and Installation 40 N6 Rev 2 N6 A850 R Maximum motion range 802 ...
Page 66: ...Setup Operation 4 End Effectors 54 N6 Rev 2 N6 A850 R Unit mm ...
Page 104: ......
Page 274: ...Maintenance 4 Cable 262 N6 Rev 2 4 7 1 Signal Power cable ...
Page 275: ...Maintenance 4 Cable N6 Rev 2 263 ...
Page 276: ...Maintenance 4 Cable 264 N6 Rev 2 4 7 2 User Cable ...