3 Installation
Proline Prosonic Flow 90
26
Hauser
3.
Set the sensor distance on the sensor assembly by moving the sensors (c) along the assembly
frame and tightening the sensor fixing nuts (d). Preferably, the sensor position is set symmet-
rically to the rail centre.
Turn the sensor adjustment screw counter-clockwise (e) so that the sensor moves upwards
inside the assembly frame. Coat the sensors with coupling fluid as explained on Page 64.
A0001119
Fig. 19:
Preparing the sensor assembly for the installation
c
Sensor
d
Sensor fixing nut
e
Sensor adjustment screw
4.
Then position the sensor assembly (f) on the pipe. Guide the tensioning bands over the ends
of the sensor assembly (g) and pull the bands tight by hand (please note that ).
!
Note!
The screw of the tensioning band lock must be opened.
A0001120
Fig. 20:
Positioning the sensor and looping the tensioning bands
f
Sensor assembly
g
End of sensor assembly
c
d
e
g
g
f
Summary of Contents for Prosonic Flow 90
Page 4: ...Brief operating instructions Proline Prosonic Flow 90 4 Endress Hauser...
Page 42: ...4 Wiring Proline Prosonic Flow 90 42 Endress Hauser...
Page 62: ...5 Operation Proline Prosonic Flow 90 62 Endress Hauser...
Page 74: ...7 Maintenance Proline Prosonic Flow 90 74 Endress Hauser...
Page 78: ...8 Accessories Proline Prosonic Flow 90 78 Endress Hauser...
Page 94: ...9 Trouble shooting Proline Prosonic Flow 90 94 Endress Hauser...
Page 108: ...10 Technical data Proline Prosonic Flow 90 108 Endress Hauser...
Page 112: ...Index Proline Prosonic Flow 90 112 Endress Hauser...
Page 114: ...www endress com worldwide BA068D 06 en 11 04 50099981 FM SGLM6 0...